We are happy to announce that our full scale test at one of Grieg Seafoods fishfarms was a huge success. The test was done in wave and wind condition close to the limit where they would normally abort the operation. The crew on the boat liked the solution and their days of hanging over the rail, or even jumping on to the buoys in wet, windy and slippery conditions might come to an end. Operations can now be done at a larger weather window in a safer, faster and more effective manner. As the crew said, with the Evolift solution we don’t even need to leave the bridge of the boat until the buoy is safely on deck. Our solution proved that it is getting people out of harms way.

Comments are closed.